The M180 South Humberside Motorway (Beltoft-Scunthorpe Section) and Connecting Roads (Variation) Scheme 2022 Confirmation Instrument 2023 No. 560


BAILII is celebrating 24 years of free online access to the law! Would you consider making a contribution?

No donation is too small. If every visitor before 31 December gives just £1, it will have a significant impact on BAILII's ability to continue providing free access to the law.
Thank you very much for your support!



BAILII [Home] [Databases] [World Law] [Multidatabase Search] [Help] [Feedback]

United Kingdom Statutory Instruments


You are here: BAILII >> Databases >> United Kingdom Statutory Instruments >> The M180 South Humberside Motorway (Beltoft-Scunthorpe Section) and Connecting Roads (Variation) Scheme 2022 Confirmation Instrument 2023 No. 560
URL: http://www.bailii.org/uk/legis/num_reg/2023/uksi_2023560_en_1.html

[New search] [Help]


Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

Statutory Instruments

2023 No. 560

Highways, England

The M180 South Humberside Motorway (Beltoft-Scunthorpe Section) and Connecting Roads (Variation) Scheme 2022 Confirmation Instrument 2023

Made

16th May 2023

Coming into force in accordance with article 1

The Secretary of State for Transport makes this Instrument in exercise of the powers conferred by sections 16(3), (5)(a), (6)(b), 17(1) and (2) and 19(1) of the Highways Act 1980( 1), and now vested in him( 2).

In accordance with section 16(8) of that Act, the Secretary of State has taken into consideration the requirements of local and national planning, including the requirements of agriculture, and is satisfied as to expediency.

1.  This Instrument may be cited as the M180 South Humberside Motorway (Beltoft-Scunthorpe Section) and Connecting Roads (Variation) Scheme 2022 Confirmation Instrument 2023 and shall come into force on the date on which notice that it has been confirmed is first published in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980.

2.  The M180 South Humberside Motorway (Beltoft-Scunthorpe Section) and Connecting Roads (Variation) Scheme 2022 (“ the Scheme”) is hereby confirmed with modifications.

3.  The Scheme as confirmed is set out in the Schedule hereto and copies of the Scheme with its accompanying plan are deposited at the offices of the Department for Transport, Floor 13 (IMD), Ashdown House, St Leonards on Sea, Hastings, East Sussex, TN37 7GA and at the offices of National Highways Limited, Lateral, 8 City Walk, Leeds LA11 9AT.

Signed by authority of the Secretary of State for Transport

Martin Gilmour

A Senior Civil Servant in the Department for Transport

16th May 2023

Article 3

SCHEDULE HIGHWAYS ACT 1980

THE M180 SOUTH HUMBERSIDE MOTORWAY (BELTOFT-SCUNTHORPE SECTION) AND CONNECTING ROADS (VARIATION) SCHEME 2022

National Highways Limited( 3) is a company appointed( 4) for the time being under Part 1 of the Infrastructure Act 2015( 5) and is the highway authority for the special roads the provision of which is authorised by this Scheme( 6).

National Highways Limited make this Scheme in exercise of the powers conferred by sections 16(3), (5)(a), (6)(b), 17(1) and (2) and 19(1) of the Highways Act 1980( 7).

1.  This Scheme may be cited at “The M180 South Humberside Motorway (Beltoft-Scunthorpe Section) and Connecting Roads (Variation) Scheme 2022” and becomes operative on the date on which the Secretary of State for Transport publishes a notice in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980 stating that this Scheme has been confirmed.

2.—(1) The M180 South Humberside Motorway (Beltoft-Scunthorpe Section) and Connecting Roads Scheme 1975( 8) is varied in accordance with this article.

(2) At the end of article 2 add “and the further plan”.

(3) At the end of article 3 add “save for those special roads comprising all or part of the roundabouts which shall become trunk roads on the date on which the M180 South Humberside Motorway (Beltoft-Scunthorpe Section) and Connecting Roads (Variation) Scheme 2022 becomes operative”.

(4) In article 5, after the definition of “the deposited plan” insert—

the further plan” means the plan numbered HE/16/OD/002, marked “The M180 South Humberside Motorway (Beltoft-Scunthorpe Section) and Connecting Roads Scheme 1975 Further Plan” which is signed on behalf of, and bears the common seal of, National Highways England Limited and is deposited at National Highways Records Management, Lateral, 8 City Walk, Leeds, LS11 9AT;

the roundabouts” means the roundabouts referred to in Schedule 2 at the junctions with Burringham Road and Brumby Common Lane respectively;

(5) In Schedule 2 (Route of the Brumby Common Link), for “a proposed roundabout on the Sheffield-Grimsby Trunk Road (A18) 1000 metres (1,094 yards) west of its junction with Scotter Road (marked D on the deposited plan)” substitute “about 2690 metres south of the A18 where the route divides at a proposed roundabout at the junction with Burringham Road (marked E on the further plan) and then continuing to about 1428 metres south of the A18 where the route divides at a new roundabout at the junction with Brumby Common Lane (marked F on the further plan) and thereafter continuing”.

Signed on behalf of
National Highways Limited
THE COMMON SEAL OF NATIONAL HIGHWAYS LIMITED
Simon Boyle
Divisional Director
National Highways Limited
31st March 2022 2022 No345

EXPLANATORY NOTE

(This note is not part of the Instrument)

This Instrument confirms a scheme “The M180 South Humberside Motorway (Beltoft-Scunthorpe Section) and Connecting Roads (Variation) Scheme 2022” to vary part of “ The M180 South Humberside Motorway (Beltoft-Scunthorpe Section) and Connecting Roads Scheme 1975” (as confirmed by “ The M180 South Humberside Motorway (Beltoft-Scunthorpe Section) and Connecting Roads Scheme 1975” ( S.I. 1975/217).

The Secretary of State has modified the M180 South Humberside Motorway (Beltoft-Scunthorpe Section) and Connecting Roads (Variation) Scheme 2022 as follows—

1.  In paragraph 2(3) for “The M180 South Humberside Motorway (Beltoft-Scunthorpe Section) and Connecting Roads (Variation) Scheme 2021” substitute “The M180 South Humberside Motorway (Beltoft-Scunthorpe Section) and Connecting Roads (Variation) Scheme 2022”.

2.  In paragraph 4 for “The M180 South Humberside Motorway (Beltoft-Scunthorpe Section) and Connecting Roads (Variation) Scheme 2021” substitute “The M180 South Humberside Motorway (Beltoft-Scunthorpe Section) and Connecting Roads Scheme 1975 Further Plan”.

3.  In paragraph 2(5) for “after “in an easterly then northerly direction” insert “to”, substitute “, for “a proposed roundabout on the Sheffield-Grimsby Trunk Road (A18) 1000 metres (1,094 yards) west of its junction with Scotter Road (marked D on the deposited plan)”.

( 1)

1980 c. 66, section 16(6)(b) was amended by the Infrastructure Act 2015 (c. 7), section 1(6), Schedule 1, Part 1, paragraphs 1 and 13(1).

( 3)

Incorporated in England and Wales under company number 934363 and its registered office is at Bridge House, Walnut Tree Close, Guildford, Surrey GU1 4LZ.

( 5)

2015 c. 7.

( 6)

Highways Act 1980 (c. 66), section 1(1A)(c) inserted by the Infrastructure Act 2015 (c. 7), section 1(6) and Schedule 1, paragraph 2(3).

( 7)

1980 c. 66, section 16(6)(b) was amended by the Infrastructure Act 2015, section 1(6), Schedule 1, Part 1, paragraphs 1 and 13(1).


BAILII: Copyright Policy | Disclaimers | Privacy Policy | Feedback | Donate to BAILII
URL: http://www.bailii.org/uk/legis/num_reg/2023/uksi_2023560_en_1.html